PROJECT PHOTOS
Drilling new well January 21, 2003 |
|
|
Atlantic Coast Water & Well Drilling came on board, providing us with a whole new water system, including drilling a new well behind the dome. The well was drilled down to 105 feet, and the water is there. Kinetico will be installing a new purification system after the well is ready.
Arriving on site - Doug
setting up the drill rig
20 foot sections
pounding down to 105 feet
final section |
The installation will take several days to create a cavern at the base of the well for the water to gather. It has been pumping on a timer for the past few days. It has to be 75' from the septic tank system, so this was the logical place for the new well.
drill rig
drill rig setting pipe
more sections
Doug cleaning out the main pipe
prehistoric dust from the well |