PROJECT PHOTOS

Drilling new well

January 21, 2003

Atlantic Coast Water & Well Drilling came on board, providing us with a whole new water system, including drilling a new well behind the dome. The well was drilled down to 105 feet, and the water is there. Kinetico will be installing a new purification system after the well is ready.

 well1.gif

Arriving on site - Doug

well3.gif

setting up the drill rig

well5.gif

20 foot sections

well7.gif

pounding down to 105 feet

well9.gif

final section

The installation will take several days to create a cavern at the base of the well for the water to gather. It has been pumping on a timer for the past few days. It has to be 75' from the septic tank system, so this was the logical place for the new well.

 well2.gif

drill rig

well4.gif

drill rig setting pipe

well8.gif

more sections

well10.gif

Doug cleaning out the main pipe

well11.gif

prehistoric dust from the well