PROJECT PHOTOS

Finished Theatre smurf tubing

Master Bedroom window

May  12, 2004

backbtn.gif homebtn.gif

Lots of activity on several fronts today. The subcontractors for FPL came this morning and trenched all the way back to our utility pillar. The also put the new DSL phone lines in the ground over the electric lines.

trenched back to the generator

almost done in the theatre

Ice line for refrigerator in kitchen

new hot water line run for Rinnai propane heater

new window finally in place

view from master bedroom window

tanks ready for some rainwater

utilities: meter breaker box on left, transfer switch on right

Billy and his dad got the upstairs bedroom window in over the space for the sliding glass doors. That was a real feat considering that they were 18 feet off the ground. The sliding glass door frame is going in today, then the actual doors. The building will then be airtight.

Got the A/C unit to the right height by adding some concrete half blocks.

Finished hot knifing and running smurf tubing in the theatre.

placing the window on the yellow scaffold

boxes for outlets: Speakers, DSL, Satellite, Electric

ice line for under cabinet IceMaker at floor level

looking down at scaffold setup

a/c unit at right height

tanks in at ground level

scary scaffold at back windows

view of tanks through hammock of oak trees