PROJECT PHOTOS Finished Theatre smurf tubing Master Bedroom window May 12, 2004 |
Lots of activity on several fronts today. The subcontractors for FPL came this morning and trenched all the way back to our utility pillar. The also put the new DSL phone lines in the ground over the electric lines.
trenched back to the generator
almost done in the theatre
Ice line for refrigerator in kitchen
new hot water line run for Rinnai propane heater
new window finally in place
view from master bedroom window
tanks ready for some rainwater
utilities: meter breaker box on left, transfer switch on right |
Billy and his dad got the upstairs bedroom window in over the space for the sliding glass doors. That was a real feat considering that they were 18 feet off the ground. The sliding glass door frame is going in today, then the actual doors. The building will then be airtight. Got the A/C unit to the right height by adding some concrete half blocks. Finished hot knifing and running smurf tubing in the theatre.
placing the window on the yellow scaffold
boxes for outlets: Speakers, DSL, Satellite, Electric
ice line for under cabinet IceMaker at floor level
looking down at scaffold setup
a/c unit at right height
tanks in at ground level
scary scaffold at back windows
view of tanks through hammock of oak trees |