PROJECT PHOTOS

Footing Ring

March 17, 2003

footing1.gif

front view

footing3.gif

living room area

footing5.gif

airlock opening

footing7.gif

back two story augment

footing9.gif

soggy living room area

footing11.gif

pile of waste concrete from forms

footing13.gif

detail of keyway in mini stemwall

These are photos of the ring foundation with the concrete forms removed. We had torrential rains overnight, hence the puddles. I bent the vertical rebar over and kept the safety caps on. The two portico monuments need to be poured next, and then we'll attach the airform all the way around. We are busy constructing the airlock, and making the electric cord for the inflator fan (150 foot length). Then we'll move the scaffolding up onto the pad (under the airform) and position the airlock and inflator fan next to the dining room sliding glass door opening. That is where we designated the airlock opening in the airform.

footing2.gif

looking toward living room augments

footing4.gif

rebar bent for airform attachment

footing6.gif

laundry room door opening

footing8.gif

airform in center of pad

footing10.gif

detail of front door foundation

footing12.gif

view of portico opening