PROJECT PHOTOS
V Bucks and Portico Arches April 19, 2003 |
|
|
V Bucks awaiting assembly
stacking pieces near its window
detail of formed arch
arch made from masonite
checking level and plumb |
We moved the V Bucks into the dome and started assembling them. It was a little tricky getting some of the bigger pieces through the airlock, essentially opening both doors at the same time and shoving them through. Just a little nerve wracking! Then we turned our attention to the portico cutout arches. Billy created some forms for the ProFoam team to foam against and they will leave a clean smooth edge for the cutouts. On Sunday we'll build the face archway that is on the front of the portico.
straight edges for big living room windows
Billy attaching arch to portico restraint
attaching other side to make archway
they match perfectly |