PROJECT PHOTOS
Foaming first layer April 22, 2003 |
|
|
Foam trailer from Alpine Foam
setting up for interview
getting camera ready
foaming seal with concrete ring
side view
guest bath glass block window
first living room window buck
portico area
starting layering
around kitchen window
first layer is slower to apply
reaching up to 8 foot level
arches are complete
making smooth layers
up on scaffold level 1
under 2nd fl master bath window
coming up on two story augment
Billy and Jason changing scaffolding
covering up the light
22 feet in the air
two story augment inflated |
Very exciting day, but exhausting. The first layer of foam was applied and Billy was able to film an interview with ProFoam president Dale Ledbetter. Dale was assisted by Jason and Cody. The pictures speak for themselves, the work took the longest when we were setting the window bucks. After that they just flew on the sides with no interruptions. After they got to the top, they started back down and finished around 7:30 pm. Then we cut a hole in the material for the 2 story augment and it inflated in one minute. It was just awesome. It is really big and will enhance the master suite and also the guest bedroom window. Today is rebar hanger day, we hope to finish up so ProFoam can do the final layer of 1 1/2 inches on Thursday.
manufactured by ProFoam
Billy and Dale Ledbetter
Dale and Jason (in suit)
kitchen window up
close-up of bottom of window
stuck in place
12 inch sill height
checking for level
Billy filming foaming process
up to back door
putting on 1/2 inch first
coating portico with second layer
finishing around arches
overhead in portico
Jason spraying
good view of kitchen and back door
Jason and Cody on 1st level
starting third level
close-up of the top of the dome
|