PROJECT PHOTOS

Foaming first layer

April 22, 2003

foam1.gif

Foam trailer from Alpine Foam

foam3.gif

setting up for interview

foam5.gif

getting camera ready

foam7.gif

foaming seal with concrete ring

foam9.gif

side view

foam11.gif

guest bath glass block window

foam13.gif

first living room window buck

foam15.gif

portico area

foam17.gif

starting layering

foam19.gif

around kitchen window

foam21.gif

first layer is slower to apply

foam23.gif

reaching up to 8 foot level

foam25.gif

arches are complete

foam27.gif

making smooth layers

foam29.gif

up on scaffold level 1

foam31.gif

under 2nd fl master bath window

foam33.gif

coming up on two story augment

foam35.gif

Billy and Jason changing scaffolding

foam37.gif

covering up the light

foam39.gif

22 feet in the air

augment4.gif

two story augment inflated

Very exciting day, but exhausting. The first layer of foam was applied and Billy was able to film an interview with ProFoam president Dale Ledbetter. Dale was assisted by Jason and Cody. The pictures speak for themselves, the work took the longest when we were setting the window bucks. After that they just flew on the sides with no interruptions. After they got to the top, they started back down and finished around 7:30 pm. Then we cut a hole in the material for the 2 story augment and it inflated in one minute. It was just awesome. It is really big and will enhance the master suite and also the guest bedroom window. Today is rebar hanger day, we hope to finish up so ProFoam can do the final layer of 1 1/2 inches on Thursday.

foam2.gif

manufactured by ProFoam

foam4.gif

Billy and Dale Ledbetter

foam6.gif

Dale and Jason (in suit)

foam8.gif

kitchen window up

foam10.gif

close-up of bottom of window

foam12.gif

stuck in place

foam14.gif

12 inch sill height

foam16.gif

checking for level

foam18.gif

Billy filming foaming process

foam20.gif

up to back door

foam22.gif

putting on 1/2 inch first

foam24.gif

coating portico with second layer

foam26.gif

finishing around arches

foam28.gif

overhead in portico

foam30.gif

Jason spraying

foam32.gif

good view of kitchen and back door

foam34.gif

Jason and Cody on 1st level

foam36.gif

starting third level

foam38.gif

close-up of the top of the dome