PROJECT PHOTOS

Making windows plumb

May 14, 15, 16 2003

fix1.gif

living room windows

fix3.gif

rope to come a long

fix5.gif

living room window with kite bracing

fix7.gif

bracing back door out from center

fix9.gif

more detail

fix11.gif

dining room bracing at airlock entry

fix13.gif

bracing method using long all-thread

fix15.gif

v buck against airform, clean lines

After most of the rebar was finished, we took several days to finish the windows before shotcrete. We restricted the airform to the V bucks for the flat planes of the windows. We pulled the tops outward to give a crisp, plumb edge. All the wood forms are temporary until after the shotcrete, they will hold and not drift around during the shotcrete process. We are trying to beat our self imposed deadline of June 1st, the start of Hurricane Season!!!

fix2.gif

bracing bottom of airform to v bucks

fix4.gif

come along to tree for tension

fix6.gif

detail of bracing for even pressure

fix8.gif

kicker detail

fix10.gif

living room v bucks

fix12.gif

reshaping opening for sliding glass door

fix14.gif

braced to 2 x 12 x 8 for pulling in airform