PROJECT

PHOTOS

Plumbing in first floor

October  14, 2003

After getting the dirt floor all cleaned up and smooth, the plumbers come in and make it all messy again. Dave's Plumbing sent Daryl and Bill to put in our first floor plumbing.

101401.gif

Bill on left, Daryl in middle of kitchen

101403.gif

the floor plan on the actual floor...

101405.gif

Jimmy digging to guest bath

1014.07.gif

Bill putting in water line to guest bath

101409.gif

in guest bath area

101411.gif

drain intersection to outside

101413.gif

back of Daryl in guest bath

101415.gif

water lines for upstairs bath

101417.gif

Bill soldering copper pipe

101419.gif

digging footing for theatre

101421.gif

footing is 12 "deep by 16"wide for ICFs

101423.gif

close-up

101426.gif

waterlines and stack in ICF wall

101428.gif

tub area

101430.gif

kitchen sink

101432.gif

bringing in dirt

101434.gif

theatre is tamped

They did a great job with plumbing supplies from Noland.   We also had some labor helpers to speed up the digging, that's Jose and Jimmy doing some digging. We dug the footing for the theatre walls that support the second floor and also dug the footing for the stairway stemwall.   This is the scariest time, you have to feel confident in your decisions because it will all be covered by concrete.

101402.gif

Bill digging to the drain line

101404.gif

drain line to guest bath

101406.gif

Debbie measuring from the center point

101408.gif

Jimmy on drain line

101410.gif

drain line to kitchen

101412.gif

another view

101414.gif

drain for toilet

101416.gif

looks like gophers were here

101418.gif

water lines for upstairs

101420.gif

putting dirt in center of theatre

101422.gif

guest bath done

101425.gif

intersection

101427.gif

waterline to pump

101429.gif

guest bath

101431.gif

ready to fill in

101433.gif

filling to footing top

101435.gif

view toward front entry