PROJECT PHOTOS
Electric in first floor Prepping for concrete pour October 15, 2003
|
|
|
Billy tying rebar in his socks
stack through theatre wall to 2nd floor
electric, cable and phone to 2nd floor
stairway stemwall footing
stack to 2nd floor
other corner of theatre
showing depth of footing - 12 inches |
Prepping for the concrete pour used up a whole evening after the electricians did their work. Putting down the vapor barrier plastic was treacherous work, very slippery. Moisture was very evident on the backside of the plastic. We worked past dusk and into the night getting the rebar in place for the footing for the theatre walls. All of the chairs and ties were documented for the county for posterity. Everything will be ready for the concrete guys the next morning.
making sure of lap
electric service in front of new stucco
3 runs of #4 rebar in footing over visqueen
showing corner bends
electric to panel box area
curved rebar for front of theatre |