Electric in first floor

Prepping for concrete pour

October  15, 2003

101501.gif

Billy tying rebar in his socks

101503.gif

stack through theatre wall to 2nd floor

101505.gif

electric, cable and phone to 2nd floor

101609.gif

stairway stemwall footing

101611.gif

stack to 2nd floor

101613.gif

other corner of theatre

101615.gif

showing depth of footing - 12 inches

Prepping for the concrete pour used up a whole evening after the electricians did their work. Putting down the vapor barrier plastic was treacherous work, very slippery. Moisture was very evident on the backside of the plastic. We worked past dusk and into the night getting the rebar in place for the footing for the theatre walls. All of the chairs and ties were documented for the county for posterity. Everything will be ready for the concrete guys the next morning.

101502.gif

making sure of lap

101504.gif

electric service in front of new stucco

101506.gif

3 runs of #4 rebar in footing over visqueen

101612.gif

showing corner bends

101614.gif

electric to panel box area

101610.gif

curved rebar for front of theatre