PROJECT PHOTOS
Finishing Theatre Walls November 14 & 15, 2003 |
|
|
5th layer in place
top of door in place with extra rebar
on back wall at 6th level
coming around the front curve
looking toward stairwell
shows how massive the theatre is
view from back at top of walls
using the 4 foot x 8 inch pieces
carving the pieces to fit the corners
Billy sitting in the back of the finished theatre |
Finishing up the top of the theatre walls was a challenge at 10 feet. We had to work off the top of the two scaffolds and raise the scissor lift. Billy doesn't have a fear of heights, but I do. Once again, Larry Regier came over to give us a hand with the rebar in the top two levels. Billy and I worked all day on Friday the 14th, and also on Saturday when Larry stopped by to help. His family also came by to see the dome, they were impressed by how large the rooms are and the height of the ceilings. Now we just have to plumb the walls and brace them vertically on the inside. Then place the vertical rebar every 18 inches down from the top.
going down western wall
inside view of western wall
putting 6th layer on
front curve looking toward dining room
door area closed in
top row before the final half pieces
Billy and Larry in the guest bath area
putting the last row on |