backbtn.gif

homebtn.gif

PROJECT

PHOTOS

Finishing Theatre Walls

November 14 & 15, 2003

111401.gif

5th layer in place

111403.gif

top of door in place with extra rebar

111405.gif

on back wall at 6th level

111407.gif

coming around the front curve

111409.gif

looking toward stairwell

111501.gif

shows how massive the theatre is

111503.gif

view from back at top of walls

111505.gif

using the 4 foot x 8 inch pieces

111507.gif

carving the pieces to fit the corners

111508.gif

Billy sitting in the back of the finished theatre

Finishing up the top of the theatre walls was a challenge at 10 feet.  We had to work off the top of the two scaffolds and raise the scissor lift. Billy doesn't have a fear of heights, but I do.

Once again, Larry Regier came over to give us a hand with the rebar in the top two levels. Billy and I worked all day on Friday the 14th, and also on Saturday when Larry stopped by to help. His family also came by to see the dome, they were impressed by how large the rooms are and the height of the ceilings. Now we just have to plumb the walls and brace them vertically on the inside. Then place the vertical rebar every 18 inches down from the top.

 

111402.gif

going down western wall

111404.gif

inside view of western wall

111406.gif

putting 6th layer on

111408.gif

front curve looking toward dining room

111410.gif

door area closed in

111502.gif

top row before the final half pieces

11504.gif

Billy and Larry in the guest bath area

111506.gif

putting the last row on