PROJECT

PHOTOS

Rebar in Theatre Walls

November 28, 2003

112801.gif

staging the 2x4x10s and 10 foot rebar

112803.gif

12.5 foot rebar will bend into the 2nd fl. beams

112805.gif

Billy and John Razete bracing back wall

112807.gif

John holding predrilled 2 x 4 x 10 for Billy

112809.gif

Billy on lift placing more vertical rebar

112811.gif

showing finished vertical bracing

We've been on location for a client for the past few weeks, so we haven't been able to finish the theatre till now. Billy and Debbie's dad put the vertical rebar in the theatre walls and started the bracing process the day after Thanksgiving. We predrilled the 2 x 4 x 10s and placed them about 5 feet apart on the interior walls. We placed 12.5 foot #4 rebar in the walls on 24 inch centers to line up with the second floor beams that will lay across the theatre for support. We placed 10 foot #4 rebar every 18 inches  in between for extra support. The second floor material (Insul-Deck) will ship next week and we should get it delivered the following week (two day trip from Kentucky). Theatre chairs have been ordered from Lane and will ship on Dec 18th.  

112802.gif

extra in the corners

112804.gif

hallway wall of theatre

112806.gif

using drywall screws and drywall drill

112808.gif

on front of theatre

1128010.gif

putting last vertical rebar in