Arrival of Insul-Deck December 9, 2003 |
|
|
Billy removing braces from floor
installing steel door in theatre
shore jacks arrive
interior of theatre - kickers removed
longest pieces are 17 1/2 feet long
stacked in driveway behind truck |
The Insul-Deck arrived at 3pm from Northern Kentucky. We received 42 pieces that we'll cut on site to match the curve of the dome wall. The second floor will be supported by the shore jacks we also got today. Some big lumber is coming on Thursday for support under the Insul-Deck while we assemble and pour it, 12 foot long 2 x 10s on top of the jacks. We have 40 jacks spaced out about every 6 feet, some of the Insul-Deck will rest on the theatre wall edge and reach the dome wall with jacks to support it there. We also ordered the lumber to form the concrete stairs for Thursday delivery. We'll assemble Insul-Deck over the theatre first.
kickers removed from front wall
it works great
more jacks
insul-deck arrives
shorter pieces for back wall area |