PROJECT

PHOTOS

Arrival of Insul-Deck

December 9, 2003

120901.gif

Billy removing braces from floor

120903.gif

installing steel door in theatre

120905.gif

shore jacks arrive

120907.gif

interior of theatre - kickers removed

120909.gif

longest pieces are 17 1/2 feet long

120911.gif

stacked in driveway behind truck

The Insul-Deck arrived at 3pm from Northern Kentucky. We received 42 pieces that we'll cut on site to match the curve of the dome wall. The second floor will be supported by the shore jacks we also got today. Some big lumber is coming on Thursday for support under the Insul-Deck while we assemble and pour it, 12 foot long 2 x 10s on top of the jacks. We have 40 jacks spaced out about every 6 feet, some of the Insul-Deck will rest on the theatre wall edge and reach the dome wall with jacks to support it there. We also ordered the lumber to form the concrete stairs for Thursday delivery. We'll assemble Insul-Deck over the theatre first.

120902.gif

kickers removed from front wall

120904.gif

it works great

120906.gif

more jacks

120908.gif

insul-deck arrives

120910.gif

shorter pieces for back wall area