PROJECT

PHOTOS

Insul-Deck over theatre

December  13, 2003

121301.gif

first few panels

121303.gif

at ten foot on top of wall

121305.gif

8 foot pieces stacked ready to go

121307.gif

aligning edges on top of wall

121309.gif

Billy on lift measuring angles to cut

121311.gif

cut angles to match edge of wall

121313.gif

Larry and Billy measuring cuts

121315.gif

making a template for the angle

121317.gif

Larry using his concrete saw to trim panels

121319.gif

it makes sparks when it cuts thru metal

121321.gif

front of the theatre ceiling

Very eventful day, putting up the first panels of the Insul-Deck over the theatre. Daniel and Denise stopped by to say hello and we put them to work! Larry came over later and helped us do the more difficult pieces toward the front of the theatre, the curved area. It really makes a difference seeing the second floor starting to take shape. We are trying to get everything formed up before Saturday Dec. 20th, so we can pour then. It will take 7 days before removal of the jacks, and 14 days before removal of the stairwell forms. We'll be putting up sections over the kitchen on Sunday. These will take longer because of the time to set the jacks to support one end on the dome wall. Incredible product!!!

121302.gif

looking up from first floor

121304.gif

to the back of the theatre

121306.gif

Daniel helping Billy place another panel

121308.gif

Denise took this photo of Daniel

121310.gif

looking down into theatre

121312.gif

kitchen wall area

121314.gif

panel ready to trim to size

121316.gif

Larry calling out measurements

121318.gif

it's a very heavy duty saw

121320.gif

ceiling of the theatre, waiting for last half piece