PROJECT PHOTOS
Insul-Deck over theatre December 13, 2003 |
|
|
first few panels
at ten foot on top of wall
8 foot pieces stacked ready to go
aligning edges on top of wall
Billy on lift measuring angles to cut
cut angles to match edge of wall
Larry and Billy measuring cuts
making a template for the angle
Larry using his concrete saw to trim panels
it makes sparks when it cuts thru metal
front of the theatre ceiling |
Very eventful day, putting up the first panels of the Insul-Deck over the theatre. Daniel and Denise stopped by to say hello and we put them to work! Larry came over later and helped us do the more difficult pieces toward the front of the theatre, the curved area. It really makes a difference seeing the second floor starting to take shape. We are trying to get everything formed up before Saturday Dec. 20th, so we can pour then. It will take 7 days before removal of the jacks, and 14 days before removal of the stairwell forms. We'll be putting up sections over the kitchen on Sunday. These will take longer because of the time to set the jacks to support one end on the dome wall. Incredible product!!!
looking up from first floor
to the back of the theatre
Daniel helping Billy place another panel
Denise took this photo of Daniel
looking down into theatre
kitchen wall area
panel ready to trim to size
Larry calling out measurements
it's a very heavy duty saw
ceiling of the theatre, waiting for last half piece |