PROJECT PHOTOS
Insul-Deck over kitchen, laundry December 17 & 18, 2003 |
|
|
Using the scissor lift, and starting on the back of the kitchen and going around the corner over the laundry room. The lift makes it easier to place the decking pieces and lay them on top of the boards and jacks.
checking the seams
putting up more jacks
setting a cross brace
looking across bathroom floor
balcony area above dining and living rooms
rebar in beam channels
over laundry room, back door
still missing small corner piece, will fit from above |
These are some more complex cuts and smaller sizes to fit into the space required to make a complete surface. So far all of our dome rebar has been perfect in height and also in spacing every 24 inches on center. That was a pretty neat accomplishment for Billy when he was tying the rebar in place in May.
two of these beams are a/c chases
making the curve
moved plans in to theatre, where it's warmer
looking across to bedroom floor
showing closed a/c chases when not needed
master suite is really huge, 1000 sq ft
three pieces so far
starting support beam across back wall of theatre |