PROJECT PHOTOS
Walking on 2nd Floor December 31, 2003 January 1, 2004 |
|
|
looking out bathroom window 12/31/03
standing in master bathroom 12/31/03
walking toward shower in bathroom
Billy on balcony loft over theatre
glueing over theatre |
Another major step forward, or up in this case. Billy was able to walk around on the decking on New Year's Eve. We doubled the jacks in the middle of each span and also added more at the edge. Then we cross braced the 2 x 10s with 2 x 4s on the underside to keep the big boards from moving. After glueing the seams of the Insul-Deck the spans will become one unit and will be easier to level for the pour. They are a little flighty when loose and not attached to each other. They have no weight of their own, but you have to get them level so you can pour the floor level, so in some places we secured them to the wood boards to keep them from being squirrely. The stairs are the next item on the list, and they should take a few days to form up. We joked about digging a hole for the scissor lift and using it as an elevator, but it is kinda big, and orange.
glueing edge to theatre wall 01/01/04
Billy glueing in master bathroom
front view, look at the 14 feet above second fl. |