PROJECT PHOTOS
Finishing facing of forms Rebar in 2nd Floor January 19 -21 2004 |
|
|
putting a curve on the front
using 1/4 inch plywood for forms
next morning, curve is done
we used old blueprints for stuffing
two pieces of #5 in the troughs
Billy with Fidel from Labor Finders
cutting them on the second floor
bending down the theatre wall rebar
Billy taking a break on the stairs
20' sticks coming down the stairs
composite view out of the window (pecan tree)
floor in bathroom area
rebar in upper stairs
whole view of stairs with rebar (not done yet) |
We finished the front forms and started on the rebar on the 21st. We had some help from Labor Finders to get the rebar on the second floor. Placing, cutting and tying the rebar only took four hours with Billy and the 3 guys working together. Then they worked on the staircase till it got dark at 5 pm. We only have a few pieces left to put in on the staircase on the landing. The plumber, Daryl, is coming today to site the drains in the master bath. Then we run some electrical conduit up from the laundry room and we should be done and ready to pour. Concrete is scheduled for 8am Saturday.
2 x 4 spacers in middle of sections
securing it to the theatre wall
showing foam glue and supports
help doing the rebar
laying them in across the entire floor
a lot of rebar
tying the wall rebar to the cross pieces
starting the stair rebar
Fidel, Diego and Martin tying the cross pieces
rebar in the troughs
view from window toward front of dome
floor in closet area
floor in master bedroom area (made a beam)
view of stairs from closet area |