PROJECT

PHOTOS

Finishing facing of forms

Rebar in 2nd Floor

January 19 -21 2004

012101.gif

putting a curve on the front

012103.gif

using 1/4 inch plywood for forms

012105.gif

next morning, curve is done

012107.gif

we used old blueprints for stuffing

012109.gif

two pieces of #5 in the troughs

012111.gif

Billy with Fidel from Labor Finders

012113.gif

cutting them on the second floor

012115.gif

bending down the theatre wall rebar

012117.gif

Billy taking a break on the stairs

012119.gif

20' sticks coming down the stairs

012122.gif

012121.gif

composite view out of the window (pecan tree)

012125.gif

floor in bathroom area

012127.gif

rebar in upper stairs

012129.gif

whole view of stairs with rebar (not done yet)

We finished the front forms and started on the rebar on the 21st. We had some help from Labor Finders to get the rebar on the second floor. Placing, cutting and tying the rebar only took four hours with Billy and the 3 guys working together. Then they worked on the staircase till it got dark at 5 pm. We only have a few pieces left to put in on the staircase on the landing. The plumber, Daryl, is coming today to site the drains in the master bath. Then we run some electrical conduit up from the laundry room and we should be done and ready to pour. Concrete is scheduled for 8am Saturday.

012102.gif

2 x 4 spacers in middle of sections

012104.gif

securing it to the theatre wall

012106.gif

showing foam glue and supports

012108.gif

help doing the rebar

012110.gif

laying them in across the entire floor

012112.gif

a lot of rebar

012114.gif

tying the wall rebar to the cross pieces

012116.gif

starting the stair rebar

012118.gif

Fidel, Diego and Martin tying the cross pieces

012120.gif

rebar in the troughs

012123.gif

view from window toward front of dome

012124.gif

floor in closet area

012126.gif

floor in master bedroom area (made a beam)

012128.gif

view of stairs from closet area