Taking jacks down

January 31, 2004

013101.gif

Billy and Isaac taking down the 2 x 10s

013103.gif

look, no hands (holding up the floor)

013105.gif

guest bedroom

013107.gif

bedroom window

013109.gif

guest bathroom

013111.gif

front of theatre

013113.gif

Billy taking down face forms from 2nd floor

013115.gif

front forms removed from theatre curve

013117.gif

watering the stairs

We talked with our engineer about the length of time needed for safely removing the jacks from the Insul-Deck and he said 7 days was just fine, but to keep watering the surface for another 7 days. He also said we should keep the forms on the stairs for that additional 7 days to minimize cracking. It seemed like it took forever to put those jacks up, but it only took us 4 hours to remove them. It was a lot easier than putting them up, too. We are going to stucco the fronts of the flat areas from which we removed the forms on Sunday. It will look finished even though we'll cover it with drywall eventually, when we start putting up walls. We're also going to try some stucco finishes on some hidden areas in a closet to see which finish we want to use in the rest of the dome. We also will seal the theatre floor to keep any excess moisture out of there and start the "balcony" platform that will raise the back theatre seats about 12 inches off the floor. This will give a better view than the back of someone's head.

013102.gif

in the kitchen

013104.gif

laundry room

013106.gif

guest bedroom without jacks

013108.gif

guest closet

013110.gif

back of theatre

013112.gif

front ceiling of theatre

013114.gif

Billy watering in late rainy afternoon

013116.gif

front forms removed from over guest bath