PROJECT

PHOTOS

Stucco application

February  13, 2004

021301.gif

dining room wall

021303.gif

kitchen wall

021305.gif

back wall by laundry room

021307.gif

two coats already on guest bath wall

021309.gif

guest closet and bedroom wall

021311.gif

long shot of dining room, red spots are sconces

021313.gif

two new sets of scaffolding

021315.gif

guest bathroom window sponge finish

We started stucco work this week by chipping away at the high spots and chipping the edges of the wall that infringed on the floor space. Billy used an impact hammer with a chisel point and a chisel blade. This took about 3 days. After that we added some stucco to the very low spots on the walls, bringing it up to a level that could be closer to the smoothness we desire. Then we brought in two laborers on Thursday and Friday to apply the stucco on the first floor dome walls. This worked pretty well, we also had a mortar mixer to make up a batch at a time. First day was 1/2 lower floor and the second day got us the rest of the way around to the living room windows. We had started in the guest bath behind the stairwell. Billy was doing most of the higher wall on a scaffold and the workers were doing the lower 6 feet (remember we have 10 foot ceilings on the first floor). We start on the entryway tomorrow. Prep work for the frame for the front door.

021302.gif

dining room wall

021304.gif

Billy coming down off ladder

021306.gif

looking toward kitchen wall

021308.gif

edge of guest bath wall

021310.gif

mortar mixer and piles of sand for stucco

021312.gif

form for bottom edge of wall curve

021314.gif

front door area, living room side