PROJECT PHOTOS
Framing for Front Door More Stucco February 16, 2004 |
|
|
Isaac spongeing the surface
Gary Regier sweeping up loose stucco
placing steel frame stud for lath attachment
really big door opening 63" x 117", wow
Billy checking plumb for the door frame |
Stucco work is starting to look like something. There are no shortcuts in this process. We have started to see results of the surface we're looking for. A smooth sand finish. We're glad we didn't compromise on this step, this finish is really elegant and not the primitive cave look as it was. We had two helpers from Labor Finders and a guest helper that was off school today. He is Gary, the son of our friend Larry Regier. We kept cleaning up the fallen stucco so it wouldn't set up as a permanent part of our floor. We got to get the framing in place to hold the V-Buck for the front door. It looks great and we'll stucco the front entrance portico to blend into the door frame. Also we'll keep working on the second coat for the first floor. We even got started on the second floor stucco in the closet area.
coming out of the closet, finish coat is smooth grey
setting V-Buck in place with steel studs
checking fit and clearance from top
narrow wall for lath and stucco
bracing at top of door V-Buck, 8" thick |