PROJECT PHOTOS
Door Lath February 27 to 3/1, 2004 |
|
|
V-Buck removed for stud installation
lath over foam
Dining room stucco finished
over living room windows, first coat
stucco to edge of front door
stucco will be seamless to edge of door
lath to edge of portico archway
2 x 4 bracing V-Buck to correct width
rough shotcrete in portico opening
Paul doing scratch coat on inside of entry |
More stucco... and started the insulation and put reinforcement around the front door. Billy put styrofoam panels between the steel studs and foamed around them with the Wind-Lock foam. He then put the V-Buck back into place and attached it to the steel studs. He attached lath to the steel studs and shot concrete nails with washers into the shotcrete with a bullet nail gun. We worked on the front door all weekend and did a lot of stucco cleanup. We had several visitors over the weekend and Friday hosted Forecast Lighting from Chicago. Lighting will be spectacular and Mr. Hart was very helpful in creating the lighting mood for the dome.
foam insulation
V-Buck waiting to go back into place
above dining room door finished
above landing finished
lath over foam and studs
close-up of washers and lath
Billy working on front door
lath on outside of door
lath over arch of front door
lath and foam on front
finished lath over front door |